Tulsa County · Oklahoma

Emergency Remote Man Camp & Sleeper Trailer Rentals In Jenks.

Sleeper trailers and man camp rentals are available in Jenks for crews staying through Tulsa County construction and repair work. A street-widening or utility assignment may change where workers enter each day, so coordinate accommodation with the project's current access plan. Restroom, shower and laundry facilities are available as supporting rentals, with our 24/7 team handling emergency deployment requests.

Serving Jenks, Oklahoma · 24/7 emergency deployment and ongoing support. Confirm your unit mix and delivery schedule with our team.

Sleeping & accommodation

Sleeper options for your Jenks project.

Compare the published sleeper and accommodation models, then open a model page for its full details.

Exterior view of two-stall sleeper trailer
Sleeper accommodation

2-Stall Sleeper Trailer

Plan separate sleeping areas for a small crew or assigned staff. The 2-stall sleeper option can form part of a temporary camp without committing to a large shared sleeping hall.

View model details ↗
Exterior side view of 20ft contractor accommodation unit
Sleeper accommodation

20ft Contractor Sleeper Trailer

The 20ft Contractor Sleeper Trailer is described with individual sleeping areas, heating, air conditioning and storage for personal belongings or work equipment.

View model details ↗
Exterior of 20ft VIP accommodation trailer
Sleeper accommodation

20ft VIP Sleeper Trailer

The 20ft VIP Sleeper Trailer is listed with a private sleeping area, bathroom, kitchenette and space for work or relaxation. Heating and air conditioning support the accommodation.

View model details ↗
Shared bunkhouse interior with rows of sleeping bunks
Sleeper accommodation

Temporary Sleeping Facilities

Create a shared sleeping area for a larger temporary workforce. Bunkhouse-style sleeping facilities help organize crew accommodation alongside a separate kitchen, dining area, and hygiene facilities.

View model details ↗
Combination office, sleeper, shower, and restroom trailer
Sleeper accommodation

Office, Sleeper, Shower & Restroom Trailer

Bring working, resting, and personal-care functions into one crew-support location. This combination trailer is an option for projects that need more than a stand-alone office or sleeping unit.

View model details ↗
Configuration at a glance

Compare sleeper specifications.

Published specifications are shown for each model. Confirm the assigned unit and site requirements when requesting availability.

Sleeper and accommodation configurations for Jenks, Oklahoma
ModelPublished specifications
2-Stall Sleeper Trailer ↗
  • Model2-stall sleeper configuration
  • Sleeping arrangementConfirm room layout and beds for the selected unit
  • Project roleSmaller crew accommodation within a temporary site
  • PlacementDelivery method and final positioning coordinated for the site
20ft Contractor Sleeper Trailer ↗
  • Model class20ft contractor accommodation
  • Sleeping arrangementBunk-room configurations; confirm the selected layout
  • Project roleTemporary crew accommodation
  • Site coordinationDelivery access, placement, electrical supply, and camp facilities
20ft VIP Sleeper Trailer ↗
  • Model class20ft VIP accommodation
  • Planning focusRoom privacy, sleeping arrangement, and furnishings
  • Project roleTemporary accommodation near the assignment
  • Selected layoutRoom and bed arrangement confirmed with the quote
Temporary Sleeping Facilities ↗
  • Facility typeShared bunkhouse-style sleeping area
  • Interior arrangementRows of bunks with a central aisle
  • Layout planningBed arrangement, circulation, and personal storage
  • Camp coordinationDining, showers, restrooms, laundry, and site utilities
Office, Sleeper, Shower & Restroom Trailer ↗
  • Equipment typeCombination crew-support trailer
  • Main functionsOffice, sleeping, shower, and restroom
  • Layout reviewWork areas, beds, shared spaces, and storage
  • Site connectionsConfirm electrical, water, and wastewater arrangements

Configuration and availability depend on the selected unit and project requirements.

Elm Street widening remains active between 111th and 121st

Jenks’ October 14, 2026 project update said crews were preparing to pave the two outside lanes on Elm Street after rain affected the schedule. The city’s Phase 1 project widens the road from three lanes to five and adds stormwater infrastructure, a trail, sidewalk, and landscaped median. A portable restroom trailer could serve an authorized road crew working beside the active corridor.

The work began in January 2025 and is projected to finish in early 2027. Phase 2 extends toward 131st Street and follows its own schedule, so the current traffic work should be tied specifically to the 111th–121st segment.

Jenks shifted Elm Street traffic onto newly paved lanes in 2026

The Elm Street project has required repeated traffic switches as crews build the new five-lane section and stormwater system. The city’s update log records a 2026 move from the temporary gravel shoo-fly to asphalt lanes, followed by paving work on the outer lanes. A contractor sleeper trailer could help an authorized contractor team maintain early or overnight shifts during such staging changes.

This is a long-running Phase 1 job between 111th and 121st Streets, not the full 20-block corridor. The city’s latest status page tied paving dates to weather and instructed drivers to follow posted traffic controls.

Facility options

Support your Jenks crew.

Plan sleeping accommodation together with the site services that make a longer assignment workable.

Temporary workforce facility with sleeper rooms, restroom, and shower access

Man Camp Facilities

Plan temporary workforce accommodation around your site, crew size, project timeline, and daily needs. EZE Trailer Rentals coordinates sleeper units with supporting shower, restroom, and laundry facilities as one site plan.

Explore facility ↗
Bunk-style sleeping accommodation inside a temporary sleeper unit

Sleeper Trailers & Units

Explore temporary sleeping accommodation for crews working away from permanent housing. Unit layouts and capacity vary, so planning starts with your crew count, privacy needs, dates, and site conditions.

Explore facility ↗
Temporary multi-stall shower trailer at a project site

Shower Trailers

Add temporary shower facilities to a workforce camp or remote project site. We review peak use, layout, water and wastewater connections, delivery access, and the project schedule before confirming a configuration.

Explore facility ↗
Sink and toilet inside a temporary restroom facility

Restroom & Bathroom Trailers

Plan temporary restroom and bathroom facilities for workforce housing, construction, and remote operations. Fixture mix, accessibility needs, site servicing, utilities, and availability are confirmed for each project.

Explore facility ↗
Temporary shower and restroom combination facility

Restroom & Shower Combination

Temporary combined restroom and shower facilities for projects that need both functions at one site.

Explore facility ↗
Commercial washer and dryer units inside a temporary laundry facility

Laundry Trailers

Support longer assignments with temporary laundry facilities planned around crew size, expected loads, utilities, servicing, and available space at the site.

Explore facility ↗

The Elm Street project includes both a trail and a west-side sidewalk

Jenks’ widening design adds a pedestrian trail on the east side of Elm and a sidewalk on the west, alongside five travel lanes and a stormwater collection system. That combination aims to change how people move through the corridor, not simply increase car capacity. A portable handwashing station station could be useful for an authorized crew placing concrete and managing materials across the work zone.

The total bond-approved amount was $16 million for the 111th-to-131st project, divided into phases. Phase 1 is under construction; Phase 2 was awarded in April 2026 and the city said work would start after utility coordination.

Stormwater construction triggered a short 114th Street closure

The city announced a temporary closure near 114th Street and Fox Run Circle in September 2026 so the Elm Street contractor could install stormwater infrastructure. Jenks estimated the closure would last five days or less, with resident driveways kept accessible. A portable restroom trailer could support an authorized drainage crew working through the short closure window.

The notice describes a specific construction impact rather than a broad detour across Jenks. Rain could affect timing, and the city directed drivers to use signs and blockades because crews would be working in and near the street.

Plan the site

Start with your workforce and location.

Share the crew size, project term, rooming preferences, and service needs. We’ll review practical placement, access, utilities, and delivery considerations for the address.

Discuss your site ↗

Jenks opened its 130,000-square-foot Freshman Academy in 2026

Jenks Public Schools welcomed students to the new Freshman Academy on August 13, 2026. KJRH reported that the 130,000-square-foot building includes science labs, student lounges, and an improved media center, replacing upgrades to a facility first built in 1999. A temporary shower-restroom trailer could fit a future authorized facilities project at the campus when contractors need temporary washroom capacity.

Crews were still applying final paint and finishing details before students returned, and the district preserved a tree more than 100 years old at the entrance. The opening marks a completed school milestone rather than an active construction claim.

The Freshman Academy’s final phase followed a 2025 groundbreaking

Jenks Public Schools broke ground on the final phase of the Freshman Academy in May 2025, describing the addition as part of a multi-phase school project and expecting an August 2026 opening. The school later opened ahead of the 2026–27 year. A portable restroom trailer could have suited authorized construction staging during the build, but the sourced article makes no claim about a rental provider.

The completed academy was reported at 130,000 square feet with science labs and updated student spaces. Linking the groundbreaking and opening gives a clear project timeline rather than presenting the school as a proposed facility now.

PSO took full ownership of Jenks’ Green Country Power Plant in 2025

Public Service Company of Oklahoma announced that it took full ownership and operation of the 795-megawatt Green Country Power Plant in Jenks on June 30, 2025. The change brought the facility fully under PSO rather than marking the construction of a new plant. A contractor sleeper trailer might support an authorized outage-maintenance crew if future work at the generating station requires extended shifts.

The utility’s announcement concerns ownership and operations, so it should not be described as a new plant opening. The site is a major part of Jenks’ industrial footprint, separate from the city’s street and school construction projects.

Phase 1 of Elm Street combines road widening with drainage work

Jenks’ city project page describes a five-lane widening from 111th to 121st Street, plus stormwater collection, sidewalks, a pedestrian trail, and landscaped medians. In September 2026, a temporary closure was needed near 114th Street for drainage installation. A portable shower trailer could serve authorized crews balancing roadway and utility work along the corridor.

The overall Elm Street bond project runs to 131st Street and totals $16 million; construction has been divided into two phases. Phase 1’s city projection was February 2027, so the page should not call the full corridor finished.

Project planning questions

Jenks workforce facility FAQs.

Can you help plan a man camp near Jenks?

Share the project address, workforce count, schedule, and the services your crew needs. EZE Trailer Rentals will review sleeper and supporting facility options for the location.

Which supporting facilities can be planned?

The focus is sleeper accommodation with supporting shower, restroom or bathroom, and laundry facilities. The mix depends on your workforce and site requirements.

Can the facilities be coordinated as one site plan?

Yes. Share how the units need to work together, along with placement, utility, delivery access, and servicing requirements. Final configuration and availability are confirmed for the project.

What information helps plan a project in Tulsa County?

A project address, crew size, rooming needs, dates, access and placement details, available utilities, and the supporting services you want to include.

Jenks’ new academy preserved a century-old tree during construction

When Jenks Freshman Academy opened in August 2026, the district had kept a tree more than a century old at the new entrance, KJRH reported. The campus was otherwise substantially renewed, with science labs, lounges, and a media center in a 130,000-square-foot building. A portable handwashing station station might suit a future authorized landscaping or grounds project around the school.

The tree is a specific continuity detail from the school’s opening, not a general claim about the site’s age. Final paint and finishing touches were still underway when students were about to return.

Jenks’ Elm Street project moves from utility coordination to phased construction

Phase 2 of the Elm Street widening—from 121st to 131st—was awarded for construction on April 7, 2026, according to a city update. The city said its start would follow utility relocation, while Phase 1 between 111th and 121st continued toward its early-2027 target. A temporary shower-restroom trailer could serve authorized crews if both phases require temporary facilities as work shifts along the corridor.

The city divided a $16 million bond project into phases so road, drainage, and pedestrian work could be coordinated. The two segments have different schedules, which is why updates should identify the location rather than treating Elm Street as one undifferentiated job.

EZE Trailer Rentals

Plan your Jenks site.

Tell us about the crew, timeline, and facilities you need for your Oklahoma project.