Murray County · Oklahoma

Emergency Remote Man Camp & Sleeper Trailer Rentals In Davis.

Sleeper trailers and man camp rentals are available in Davis for crews assigned to highway repairs, rail work or property improvements near Turner Falls. Supporting restroom facilities, showers and laundry can accompany the overnight accommodation for a longer job. Our team is available 24/7 to coordinate emergency deployment when an unexpected repair or recovery assignment creates extra workforce housing needs.

Serving Davis, Oklahoma · 24/7 emergency deployment and ongoing support. Confirm your unit mix and delivery schedule with our team.

Sleeping & accommodation

Sleeper options for your Davis project.

Compare the published sleeper and accommodation models, then open a model page for its full details.

Exterior view of two-stall sleeper trailer
Sleeper accommodation

2-Stall Sleeper Trailer

Plan separate sleeping areas for a small crew or assigned staff. The 2-stall sleeper option can form part of a temporary camp without committing to a large shared sleeping hall.

View model details ↗
Exterior side view of 20ft contractor accommodation unit
Sleeper accommodation

20ft Contractor Sleeper Trailer

The 20ft Contractor Sleeper Trailer is described with individual sleeping areas, heating, air conditioning and storage for personal belongings or work equipment.

View model details ↗
Exterior of 20ft VIP accommodation trailer
Sleeper accommodation

20ft VIP Sleeper Trailer

The 20ft VIP Sleeper Trailer is listed with a private sleeping area, bathroom, kitchenette and space for work or relaxation. Heating and air conditioning support the accommodation.

View model details ↗
Shared bunkhouse interior with rows of sleeping bunks
Sleeper accommodation

Temporary Sleeping Facilities

Create a shared sleeping area for a larger temporary workforce. Bunkhouse-style sleeping facilities help organize crew accommodation alongside a separate kitchen, dining area, and hygiene facilities.

View model details ↗
Combination office, sleeper, shower, and restroom trailer
Sleeper accommodation

Office, Sleeper, Shower & Restroom Trailer

Bring working, resting, and personal-care functions into one crew-support location. This combination trailer is an option for projects that need more than a stand-alone office or sleeping unit.

View model details ↗
Configuration at a glance

Compare sleeper specifications.

Published specifications are shown for each model. Confirm the assigned unit and site requirements when requesting availability.

Sleeper and accommodation configurations for Davis, Oklahoma
ModelPublished specifications
2-Stall Sleeper Trailer ↗
  • Model2-stall sleeper configuration
  • Sleeping arrangementConfirm room layout and beds for the selected unit
  • Project roleSmaller crew accommodation within a temporary site
  • PlacementDelivery method and final positioning coordinated for the site
20ft Contractor Sleeper Trailer ↗
  • Model class20ft contractor accommodation
  • Sleeping arrangementBunk-room configurations; confirm the selected layout
  • Project roleTemporary crew accommodation
  • Site coordinationDelivery access, placement, electrical supply, and camp facilities
20ft VIP Sleeper Trailer ↗
  • Model class20ft VIP accommodation
  • Planning focusRoom privacy, sleeping arrangement, and furnishings
  • Project roleTemporary accommodation near the assignment
  • Selected layoutRoom and bed arrangement confirmed with the quote
Temporary Sleeping Facilities ↗
  • Facility typeShared bunkhouse-style sleeping area
  • Interior arrangementRows of bunks with a central aisle
  • Layout planningBed arrangement, circulation, and personal storage
  • Camp coordinationDining, showers, restrooms, laundry, and site utilities
Office, Sleeper, Shower & Restroom Trailer ↗
  • Equipment typeCombination crew-support trailer
  • Main functionsOffice, sleeping, shower, and restroom
  • Layout reviewWork areas, beds, shared spaces, and storage
  • Site connectionsConfirm electrical, water, and wastewater arrangements

Configuration and availability depend on the selected unit and project requirements.

The 2015 rock slide that narrowed I-35 near Davis

Rock-slide repairs near Turner Falls were still constraining I-35 in July 2015, weeks after flooding in the Arbuckles. ODOT kept one lane open in each direction between mile markers 47 and 51. With construction and public traffic sharing a narrowed corridor, a modern repair compound could use restroom trailers to reduce routine worker trips out of the controlled area. Delivery and servicing would need the same attention to access as heavy equipment. ODOT’s July 7 advisory shows how quickly that access plan could change: severe weather postponed the scheduled stabilization work that day, the southbound US-77 entrance remained closed, and drivers were directed to the SH-7 entrance in Davis. Even the support facilities would have to follow the work zone’s route, not simply the shortest approach.

The October 2025 fire at TJ’s Resale and Gifts

Main Street traffic was redirected as firefighters from several departments battled the October 29, 2025 fire at TJ’s Resale and Gifts in downtown Davis. KXII reported that nearby businesses were evacuated as flames rose from the shop. No injuries had been reported in the initial coverage, and the Oklahoma Fire Marshal was investigating the cause.

A neighboring owner credited a firewall with limiting the spread, although the adjoining building suffered smoke damage and some roof damage. That distinction matters when planning repairs: a shop can need work even when the main fire was next door. If cleanup closed bathroom access, restroom trailers could serve contractors outside the restricted building, positioned to leave the reopened street and debris-removal route clear.

Facility options

Support your Davis crew.

Plan sleeping accommodation together with the site services that make a longer assignment workable.

Temporary workforce facility with sleeper rooms, restroom, and shower access

Man Camp Facilities

Plan temporary workforce accommodation around your site, crew size, project timeline, and daily needs. EZE Trailer Rentals coordinates sleeper units with supporting shower, restroom, and laundry facilities as one site plan.

Explore facility ↗
Bunk-style sleeping accommodation inside a temporary sleeper unit

Sleeper Trailers & Units

Explore temporary sleeping accommodation for crews working away from permanent housing. Unit layouts and capacity vary, so planning starts with your crew count, privacy needs, dates, and site conditions.

Explore facility ↗
Temporary multi-stall shower trailer at a project site

Shower Trailers

Add temporary shower facilities to a workforce camp or remote project site. We review peak use, layout, water and wastewater connections, delivery access, and the project schedule before confirming a configuration.

Explore facility ↗
Sink and toilet inside a temporary restroom facility

Restroom & Bathroom Trailers

Plan temporary restroom and bathroom facilities for workforce housing, construction, and remote operations. Fixture mix, accessibility needs, site servicing, utilities, and availability are confirmed for each project.

Explore facility ↗
Temporary shower and restroom combination facility

Restroom & Shower Combination

Temporary combined restroom and shower facilities for projects that need both functions at one site.

Explore facility ↗
Commercial washer and dryer units inside a temporary laundry facility

Laundry Trailers

Support longer assignments with temporary laundry facilities planned around crew size, expected loads, utilities, servicing, and available space at the site.

Explore facility ↗

A new siding was selected to reduce blocked crossings in Davis

A train stopped across a road can divide a town’s everyday routes. Davis’s Occupied Crossing Mitigation Project addressed that problem through a new track siding, removal of an existing siding, closure of two road crossings and safety improvements at three others. FRA’s January 2025 selections included up to $25.448 million for the project, intended to reduce blocked-crossing problems for motorists and emergency responders.

The federal record covers development, design, right-of-way and construction. It establishes the selection and scope, rather than an opening date. Once work reaches construction, a contractor could give its crew restroom trailers at an equipment compound reached through usable crossings. The facility and its servicing route should remain accessible as individual crossings change.

Turner Falls prepared new spaces ahead of its centennial

Buildings were being demolished and pads laid out at Turner Falls when KXII visited in February 2023. The park manager described a renovation program involving electrical, water and sewer contractors, with new shelters, showers and luxury tepees among the planned additions. The approach to the park’s 2025 centennial gave the work a longer horizon than a routine preseason cleanup. During a comparable bathhouse changeover, shower trailers could maintain a temporary washing area where the park approved the location and connections. That would allow the contractor’s work zone to stay separate from a designated visitor facility. The manager also identified pedestrian access beside the two-way park road as an issue and said an iconic rock feature would be retained while other spaces changed.

Plan the site

Start with your workforce and location.

Share the crew size, project term, rooming preferences, and service needs. We’ll review practical placement, access, utilities, and delivery considerations for the address.

Discuss your site ↗

Davis planned to replace the working parts of an aging treatment plant

A treatment-plant rebuild still needs a clean place for the construction workforce to wash and use the bathroom. combined shower and restroom trailers could serve a contractor’s compound in Davis with water and waste arrangements independent of the equipment under construction.

Davis’s April 18, 2023 financing decision covered a substantial replacement program. OWRB approved a $17.25 million loan after describing the existing wastewater plant as near the end of its operating life. The proposed work included headworks, biological treatment, ultraviolet disinfection, solids dewatering and an operations building.

The receiving stream was identified as a tributary joining Dry Sandy Creek. Maintaining treatment while new components are commissioned would make sequencing central to a project of this kind; the loan notice describes the approved improvements, not their eventual commissioning date.

Turner Falls crews opened access while removing wildfire fuels

At Turner Falls, wildfire mitigation also meant reaching ground where firefighting equipment had little access. Oklahoma Forestry Services announced $134,477 in March 2023 for nine Davis projects covering a target of 1,500 acres. Removing cedar and ground fuels and cutting firebreaks formed the core of the Natural Wildland Restoration Project.

Extended vegetation assignments can bring outside workers to an accommodation base, where mobile laundry facilities provides for ordinary clothing loads between shifts. That support belongs where water and wastewater can be managed, away from the treatment area. The state’s January 2025 board packet recorded pile burning at Turner Falls in mid-December and completion of the scheduled Forestry Services work covered by the grant. The later report documents work on the ground after the original funding announcement.

Paul Wolff’s three wins at Cross Bar Ranch in 2025

Paul Wolff left the April 10–12, 2025 Clash at Cross Bar Ranch with wins in UTV Open, UTV Modified and 4400 Unlimited. Ultra4 USA’s results put his Unlimited winning time at just under two and a half hours. Elsewhere on the Davis-area course, the Stock-class finish was much closer: John Rants beat Mick Henson by 7.3 seconds. Between races, teams have a different kind of schedule to manage. Where an organizer provides an overnight paddock or support area, shower trailers can give people staying there somewhere to wash without leaving the venue. A planned setup would keep clean-water delivery and wastewater collection clear of race traffic. The three-day meeting brought nine classes onto the ranch’s terrain.

The 2005 flood washed away Turner Falls beaches

Sand had to be brought back to Turner Falls after the August 14–15, 2005 floods. The NWS storm report records washed-away beaches, an eroded creek bank and a low-water crossing that stranded some campers while others evacuated. Davis closed its park for about a week for repairs.

A restoration crew rebuilding a waterside recreation area needs facilities on firm, reachable ground. restroom trailers could serve a cleared work compound once access was restored, with servicing kept away from eroded banks and vehicle routes used to deliver materials.

The report lists 150 tons of replacement sand delivered to rebuild the beaches. That detail gives the cleanup a physical scale: reopening required moving material and restoring the park, not merely waiting for Honey Creek to fall.

Project planning questions

Davis workforce facility FAQs.

Can you help plan a man camp near Davis?

Share the project address, workforce count, schedule, and the services your crew needs. EZE Trailer Rentals will review sleeper and supporting facility options for the location.

Which supporting facilities can be planned?

The focus is sleeper accommodation with supporting shower, restroom or bathroom, and laundry facilities. The mix depends on your workforce and site requirements.

Can the facilities be coordinated as one site plan?

Yes. Share how the units need to work together, along with placement, utility, delivery access, and servicing requirements. Final configuration and availability are confirmed for the project.

What information helps plan a project in Murray County?

A project address, crew size, rooming needs, dates, access and placement details, available utilities, and the supporting services you want to include.

Building the water link from the Arbuckles to Davis

A reservoir and its delivery system do not necessarily finish together. On a comparable project today, man camp facilities could house outside trades through successive contracts, with the number of beds following crew rotations and available local accommodation.

The Arbuckle Project, built to supply Davis and other communities, shows that sequence. Reclamation awarded its dam contract in June 1964 and the aqueduct and pumping-plant contract in August 1965. The dam was completed in June 1966; the conveyance work was essentially complete in August 1967.

Operating responsibility passed to the Arbuckle Master Conservancy District on January 1, 1968. Construction had progressed from storing water to delivering it, before the district took over running the system. Any modern workforce base would need its bathing, bathroom and laundry arrangements in place throughout the occupied stages.

Falls Creek added a lodge and event center in 2016

Falls Creek’s February 2, 2016 dedication introduced a new event center, fifty-room lodge and welcome center at the conference campus near Davis. The Baptist convention’s news staff described a four-story lodging building linked to meeting spaces and a new main reception area. The completed Mathena Family Event Center included adaptable rooms, a large hall and a commercial-style kitchen.

Those additions aimed to extend the campus’s use beyond summer camp into conferences through more of the year. Construction on a campus with guests raises a practical question of separation: builders need facilities without passing through occupied lodging. For a comparable expansion, restroom trailers within the contractor’s compound would give the workforce its own bathroom access while keeping construction movements out of the public arrival route.

EZE Trailer Rentals

Plan your Davis site.

Tell us about the crew, timeline, and facilities you need for your Oklahoma project.